All because the soap dish fell off the wall...it lead to the walls being removed around the tub/shower area. We had shower doors but they were removed YAY! I am thankful to our handyman Neil for his hard work, dedication to perfection and clean up. Neil has a day job and this was done on his vacation and after work. He pulled in a vinyl guy for the window thanks to Petey. A tile guy named Dave thank you Dave for great looking tiles! The reno began on August 5 and ended with a shower on the 14.
 |
| Rotten window area |
 |
| 2 x 4's were all rotted and needed to be removed |
 |
| Newly added insulation |
 |
| Waterresistant drywall not plywood as the previous patch job <before us> |
 |
| Mudded ready to go, almost |
 |
| TAADAA! Tile! |
This job could have been very unpleasant but because of our handyman Neil and his work ethic it was pleasant and at times comical. Not too mention the BBQ fire on the last day! LOL Thank you Neil and your cohorts for a terrific bathroom renovation.